Sign In | Join Free | My xxjcy.com |
|
Brand Name : FMS
Certification : ISO CE
Place of Origin : CHINA MAINLAND
MOQ : 1 Set
Price : Negotiable
Payment Terms : L/C, T/T, D/A, D/P
Supply Ability : 20 Sets Per Month
Delivery Time : 50 Working Days
Packaging Details : 40' FLC
Product Name : W Purlin Guardrail Roll Forming Machine Highway Guardrail Roll Forming Machine
Thickness : 2.5-3.5mm
Speed of Machine : 10-15meters/Min
Roll Stations : 20 Roll Stations (with 6PCS Rollers for Leveling D
Voltage : 380V.50HZ.3Phase
Diameter of Shaft : 110mm
Type of Cutting : Hydraulic Cutting
Cutter Power : 15.5kw(Pressure:25MPa) 3 PCS Cutter
Splint Thickness : 22mm
Material of Shaft : Forged 45# Steel
W Purlin Guardrail Roll Forming Machine Highway Guardrail Roll Forming Machine
Specification
Item | Specification | |
1.Information of raw material | Suitable material: | Galvanized coil |
Width: | 748mm | |
Thickness: | 2.5-3.5mm | |
Yield strength: | Q235A HR | |
2.Production specification | Detailed as the file | |
3.Power requirement: | Main power: | 22kw two sets |
Cutter power: | 15.5kw(pressure:25mpa) 3 pcs cutter | |
Speed of machine: | 10-15meters/min | |
4.Hydraulic de-coiler: | Loading: | 5tons |
Inner diameter | 508mm | |
Type: | Automatic type | |
5.Machine specification: | Structure: | 400I beam |
Roll stations: | 20 roll stations (with 6pcs rollers for leveling diameter:80mm) | |
Splint thickness: | 22mm | |
Diameter of shaft: | 110mm, | |
Material of shaft: | Forged 45# steel | |
Type of cutting: | Saw cutting | |
Material of roller: | CR12 with heat treatment: HRC58-62 | |
Sizes of machine: | 15.5*1.0*1.5meters | |
Material of punching mold: | Cr12,hydraulic pre-punching | |
Sizes of chain: | 2.0inch |
Guarantee
1. Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.
2. Repairs will not be performed even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
Payment terms
40% in advance as down payment
60% is paid before the shipment is processed
Delivery
FOB: Tianjin Xingang Port
The Delivery Time: 60 working days after the down payment is received.
![]() |
W Purlin 3.5mm Highway Guardrail Roll Forming Machine Saw Cutting Images |